STH 59 over STEEL BROOK

3.0M E JCT CTH D · County 055, Wisconsin · Built 1970 · 2 Lanes · 3,606 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
B28005900000000
Year Built
1970
Length
8.4 m (27.6 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
3,606
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.