CTH O over IH 94

2.1M N JCT CTH B · County 055, Wisconsin · Built 1964 · 2 Lanes · 510 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B28003400000000
Year Built
1964
Reconstructed
2009
Length
65.6 m (215.2 ft)
Max Span
21 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
510
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.