USH 12E-STH B26S-S over ROCK RIVER

0.1M E JCT STH 106 · County 055, Wisconsin · Built 1973 · 4 Lanes · 15,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B28000900000000
Year Built
1973
Reconstructed
2022
Length
91.4 m (299.9 ft)
Max Span
30.2 m
Width
16.8 m (55.1 ft)
Lanes
4
Daily Traffic
15,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,530,000
Total Project Cost
$2,296,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.