CTH N NB /BRIDGE over FRENCH CREEK WB

0.8M S JCT STH 95 · County 053, Wisconsin · Built 2015 · 2 Lanes · 520 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B27016100000000
Year Built
2015
Length
28.2 m (92.5 ft)
Max Span
27.4 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
520
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.