IH 94 EB over S FK BUFFALO RIVER

3.3M E JCT USH 10 TO E · County 053, Wisconsin · Built 1966 · 2 Lanes · 12,350 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B27003500000000
Year Built
1966
Length
39 m (128 ft)
Max Span
18.7 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
12,350
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.