IH 94 EB over STH 95

7.0M E JCT STH 121 TO E · County 053, Wisconsin · Built 1966 · 3 Lanes · 12,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B27002400000000
Year Built
1966
Length
77.3 m (253.6 ft)
Max Span
23 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
12,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.