CTH F 4TH ST over SUGAR RIVER MILLRACE

0.2M W JCT STH 11 · County 045, Wisconsin · Built 2005 · 2 Lanes · 1,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
B23014200000000
Year Built
2005
Length
27.6 m (90.6 ft)
Max Span
13.4 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
1,100
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.