CTH T over BR SUGAR RIVER

3.8M S JCT STH 81 · County 045, Wisconsin · Built 2002 · 2 Lanes · 533 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B23013100000000
Year Built
2002
Length
10.5 m (34.4 ft)
Max Span
9.8 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
533
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.