STH 11-STH 81 over SUGAR RIVER

3.1M E JCT CTH OK · County 045, Wisconsin · Built 1975 · 2 Lanes · 7,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B23004000000000
Year Built
1975
Length
70 m (229.7 ft)
Max Span
23.3 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
7,800
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.