STH 11 EB-STH 81 E over STH 69

0.6M E JCT STH 81 TO E · County 045, Wisconsin · Built 1978 · 2 Lanes · 5,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B23003600000000
Year Built
1978
Length
53.2 m (174.5 ft)
Max Span
26.4 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
5,300
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.