LRD GRANDVIEW RD over NEWELL CREEK

2.9 M E. JCT CTH E · County 043, Wisconsin · Built 2005 · 2 Lanes · 170 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B22024600000000
Year Built
2005
Length
18.4 m (60.4 ft)
Max Span
10.4 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
170
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.