USH 61/151 SB-STH over LRD SANDY HOOK RD

2.3M S JCT CTH H · County 043, Wisconsin · Built 1988 · 2 Lanes · 7,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
B22009900000000
Year Built
1988
Length
37 m (121.4 ft)
Max Span
16.9 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
7,750
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.