LRD BOICE CREEK RD over PIGEON RIVER
0.1M S JCT CTH N · County 043, Wisconsin · Built 1984 · 2 Lanes · 76 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.807833, -90.743972
This bridge is in worse condition than 40.4% of bridges in County 043. The average bridge in Wisconsin is 0 years old; this one is 42 years old.
Nearby Bridges
CTH N over PIGEON RIVER
Built 1962
LRD OLD POTOSI RD over PIGEON CREEK
Built 1992
LRD OLD POTOSI RD over BOICE CREEK
Built 1987
LRD BOICE CREEK RD over BR BOICE CREEK
Built 2001
LRD SANDY HOLLOW R over SANDY CREEK
Built 2005
LRD GRAYS MILL RD over GRANT RIVER
Built 1977
LRD BOICE CREEK RD over BOICE CREEK
Built 2003
CTH A over GRANT RIVER
Built 2006
LRD PIGEON RIVER R over PIGEON RIVER
Built 1992
LRD PINE KNOB RD over GRANT RIVER
Built 1997
Bridge Details
- Structure #
- B22008100000000
- Year Built
- 1984
- Length
- 14 m (45.9 ft)
- Max Span
- 13.4 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 76
- Material
- Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.