STH 133 over BR BULLHEAD SLOUGH

4.5M N JCT CTH K · County 043, Wisconsin · Built 1950 · 2 Lanes · 1,300 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
B22002300000000
Year Built
1950
Length
6.9 m (22.6 ft)
Max Span
3 m
Lanes
2
Daily Traffic
1,300
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.