LRD GOODMAN PARK R over PESHTIGO RIVER

6.8M N JCT CTH C · County 041, Wisconsin · Built 2007 · 2 Lanes · 120 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B21002300000000
Year Built
2007
Length
45.9 m (150.6 ft)
Max Span
17.1 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
120
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.