CTH HH over S BR MANITOWOC RIVER

3.4M E JCT USH 151 · County 039, Wisconsin · Built 1929 · 2 Lanes · 708 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B20067800000000
Year Built
1929
Reconstructed
1976
Length
9.8 m (32.2 ft)
Max Span
9.6 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
708
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.