STH 23 over LRD BROOKE STREET
0.8M E JCT USH41 WITH STH · County 039, Wisconsin · Built 2001 · 4 Lanes · 29,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.784194, -88.457167
This bridge is in worse condition than 58.7% of bridges in County 039. The average bridge in Wisconsin is 0 years old; this one is 25 years old.
Nearby Bridges
LRD W ARNDT STREET over FOND DU LAC RIVER
Built 2019
LRD BROOKE ST over E BR FOND DU LAC RIVER
Built 1978
LRD W DIVISION ST over WEST BRANCH FOND DU LAC
Built 2024
LRD DOTY STREET over E. BRN FOND DU LAC RIVER
Built 2010
LRD N HICKORY ST over WEST DITCH
Built 1993
LRD FOREST AVE over W BR FOND DU LAC RIVER
Built 1990
USH 45 (SCOTT ST) over FOND DU LAC RIVER
Built 1971
LRD DIVISION ST over E BR FOND DU LAC RIVER
Built 1981
LRD FOREST AVE over E BR FOND DU LAC RIVER
Built 1965
LRD 1ST ST over E BR FOND DU LAC RIVER
Built 1968
Bridge Details
- Structure #
- B20004600000000
- Year Built
- 2001
- Length
- 386.1 m (1266.7 ft)
- Max Span
- 35.6 m
- Width
- 19.8 m (65 ft)
- Lanes
- 4
- Daily Traffic
- 29,100
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,228,000
- Total Project Cost
- $9,342,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.