STH 139 over NICOLET STATE TRAIL

14.2M N JCT CTH O · County 037, Wisconsin · Built 1976 · 2 Lanes · 720 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B19000400000000
Year Built
1976
Reconstructed
2022
Length
43.4 m (142.4 ft)
Max Span
14.4 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
720
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.