LRD SB HASTINGS WA over USH 12 WB (CLAIREMONT AV

HWY 12 · County 035, Wisconsin · Built 2008 · 2 Lanes · 11,350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B18019200000000
Year Built
2008
Length
71.5 m (234.6 ft)
Max Span
36.6 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
11,350
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,212,000
Total Project Cost
$1,818,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.