LRD ABBE HILL RD over STH 312E(NORTH CROSSING)

AT STH 312 · County 035, Wisconsin · Built 2003 · 2 Lanes · 960 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B18018900000000
Year Built
2003
Length
61.4 m (201.4 ft)
Max Span
33 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
960
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.