STH312 EB(OLD STH1 over CHIPPEWA RIVER

1.2M N JCT CTH F · County 035, Wisconsin · Built 1992 · 2 Lanes · 12,450 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B18013200000000
Year Built
1992
Reconstructed
1993
Length
453.5 m (1487.9 ft)
Max Span
46.9 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
12,450
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.