CTH CF over COON FORK CREEK

4.1M E USH 12 · County 035, Wisconsin · Built 1990 · 2 Lanes · 164 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
B18011800000000
Year Built
1990
Length
25 m (82 ft)
Max Span
23.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
164
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.