USH 12 EB-CLAIREMO over BIKE TR.-CHIPPEWA RIVER

1.3M E JCT CTH E · County 035, Wisconsin · Built 1993 · 3 Lanes · 10,450 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B18011400000000
Year Built
1993
Length
257.7 m (845.5 ft)
Max Span
36.6 m
Width
13.7 m (44.9 ft)
Lanes
3
Daily Traffic
10,450
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.