STH 85 over ROCK CREEK

5.2M E JCT CTH O · County 033, Wisconsin · Built 2021 · 2 Lanes · 2,800 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
B17022600000000
Year Built
2021
Length
43.1 m (141.4 ft)
Max Span
41.8 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
2,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.