IH 94 WB over LRD 250TH ST

5.4M W JCT STH 25 TO N · County 033, Wisconsin · Built 2019 · 2 Lanes · 17,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B17021800000000
Year Built
2019
Length
40 m (131.2 ft)
Max Span
18.3 m
Width
19.1 m (62.7 ft)
Lanes
2
Daily Traffic
17,750
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.