LRD 231ST ST over S FK HAY RIVER

0.3M W JCT STH 79 · County 033, Wisconsin · Built 1995 · 2 Lanes · 68 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B17014700000000
Year Built
1995
Length
24.4 m (80.1 ft)
Max Span
11.9 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
68
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.