CTH H HOLLY AVE over IH 94

2.0M S JCT USH 12 · County 033, Wisconsin · Built 1959 · 2 Lanes · 940 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B17004900000000
Year Built
1959
Reconstructed
1993
Length
72.2 m (236.9 ft)
Max Span
22.8 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
940
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.