STH 105-UNION ST over ST LOUIS RIVER
AT MINNESOTA STATE LINE · County 031, Wisconsin · Built 1910 · 2 Lanes · 2,205 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
46.656758, -92.200936
This bridge is in worse condition than 73.5% of bridges in County 031. The average bridge in Wisconsin is 0 years old; this one is 116 years old.
Nearby Bridges
MN 39 over ST LOUIS RIVER
Built 1910
CSAH 3 over DM;IR RY
Built 1982
LRD IRONDALE RD over POKEGAMA RIVER
Built 1930
LRD GARETH RD (DEA over POKEGAMA RIVER
Built 1918
M 536 over STEWART CREEK
Built 1919
MN 23 over MISSION CREEK
Built 1937
STH 105-61ST ST over POKEGAMA RIVER
Built 2020
M 107 over W. MUNGER STATE TRAIL
Built 2011
MN 23 over ST LOUIS RIVER
Built 1919
LRD CEMETERY RD over POKEGAMA RIVER
Built 2005
Bridge Details
- Structure #
- B16075500000000
- Year Built
- 1910
- Reconstructed
- 2001
- Length
- 580.6 m (1904.9 ft)
- Max Span
- 45.7 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 2,205
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Railroad
- Last Inspected
- N/A
- Est. Improvement
- $7,257,000
- Total Project Cost
- $10,885,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.