LRD EAST MAIL RD over EAU CLAIRE RIVER
0.1M S JCT CTH Y · County 031, Wisconsin · Built 2024 · 2 Lanes · 220 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
46.261472, -91.572247
This bridge is in worse condition than 6.6% of bridges in County 031. The average bridge in Wisconsin is 0 years old; this one is 2 years old.
Nearby Bridges
LRD JOHNSON RD over EAU CLAIRE RIVER
Built 2019
LRD SOUTH SHORE RO over EAU CLAIRE LAKES (RIVER)
Built 2023
STH 27 over OUNCE RIVER
Built 2023
LRD MCCUMBER RD over EAU CLAIRE RIVER
Built 2005
STH 27 over EAU CLAIRE RIVER
Built 1959
LRD E COPPER MINE over OUNCE RIVER
Built 2010
LRD LIDBERG BRIDGE over EAU CLAIRE RIVER
Built 1950
LRD CHEEVER RD over OUNCE RIVER
Built 2010
LRD LAWLER BRIDGE over EAU CLAIRE RIVER
Built 2022
CTH G over TOTAGATIC RIVER
Built 1988
Bridge Details
- Structure #
- B16015000000000
- Year Built
- 2024
- Length
- 15.4 m (50.5 ft)
- Max Span
- 14.6 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 220
- Material
- Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.