STH 35 over BLACK RIVER

11.1M N JCT CTH M · County 031, Wisconsin · Built 1992 · 2 Lanes · 1,400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
B16007400000000
Year Built
1992
Length
14 m (45.9 ft)
Max Span
13.4 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
1,400
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$229,000
Total Project Cost
$344,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.