USH 2-USH 53-E 2ND over NEMADJI RIVER

2.4M E JCT USH 53 TO N · County 031, Wisconsin · Built 1989 · 5 Lanes · 23,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B16006600000000
Year Built
1989
Length
92.4 m (303.1 ft)
Max Span
30.5 m
Width
23.3 m (76.4 ft)
Lanes
5
Daily Traffic
23,300
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.