STH 42 SB-STH 57 S over LRD GREEN BAY RD

2.8M S JCT CTH TT · County 029, Wisconsin · Built 1977 · 2 Lanes · 7,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B15000500000000
Year Built
1977
Length
33.4 m (109.6 ft)
Max Span
14.3 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
7,750
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$470,000
Total Project Cost
$705,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.