CTH PD over DRY TRIBUTARY TO BADGER

1.9M W JCT CTH M · County 025, Wisconsin · Built 2024 · 2 Lanes · 15,026 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
B13091900000000
Year Built
2024
Length
11.9 m (39 ft)
Max Span
3.7 m
Width
45.7 m (149.9 ft)
Lanes
2
Daily Traffic
15,026
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.