CTH M EB over SIX MILE CREEK

1.7M W JCT STH 113 · County 025, Wisconsin · Built 2024 · 2 Lanes · 10,575 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B13089500000000
Year Built
2024
Length
26.6 m (87.3 ft)
Max Span
12.8 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
10,575
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.