CTH F over RYAN CREEK

1.0M N JCT CTH J · County 025, Wisconsin · Built 2015 · 2 Lanes · 360 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B13067100000000
Year Built
2015
Length
15.4 m (50.5 ft)
Max Span
14.6 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
360
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.