CTH S & P over SUGAR RIVER

1.0M S JCT CTH J · County 025, Wisconsin · Built 2007 · 2 Lanes · 6,886 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B13060400000000
Year Built
2007
Length
13.1 m (43 ft)
Max Span
12.2 m
Width
16.3 m (53.5 ft)
Lanes
2
Daily Traffic
6,886
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.