LRD SPRING VALLEY over BR HALFWAY PRAIRIE CR

0.4M W.JCT CTH KP · County 025, Wisconsin · Built 2004 · 2 Lanes · 263 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B13057500000000
Year Built
2004
Length
11.1 m (36.4 ft)
Max Span
10.4 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
263
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.