USH 12/18 WB-S BEL over CTH BB MONONA DR
0.9M W JCT USH 51 TO N · County 025, Wisconsin · Built 1988 · 4 Lanes · 58,500 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
43.045, -89.323947
This bridge is in worse condition than 24.1% of bridges in County 025. The average bridge in Wisconsin is 0 years old; this one is 38 years old.
Nearby Bridges
USH 12/18 EB-S BEL over CTH BB MONONA DR
Built 1988
USH 12/18 WB-S BEL over YAHARA RIVER
Built 1988
USH 12/18-S BELTLI over DRAINAGE DITCH
Built 1988
CTH BW / S BROADWA over YAHARA RIVER
Built 1989
LRD WINNEQUAH RD ( over PIRATE ISLAND CHANNEL
Built 2021
LRD FEMRITE RD over BR YAHARA RIVER
Built 1971
USH 12/18 EB-S BEL over YAHARA RIVER
Built 1988
LRD BRIDGE RD over YAHARA RIVER
Built 1967
USH 12 EB-USH 18 E over USH 51
Built 1988
USH 51 over BR YAHARA RIVER
Built 1956
Bridge Details
- Structure #
- B13031800000000
- Year Built
- 1988
- Length
- 41.9 m (137.5 ft)
- Max Span
- 20.4 m
- Width
- 16.8 m (55.1 ft)
- Lanes
- 4
- Daily Traffic
- 58,500
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $576,000
- Total Project Cost
- $864,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.