USH 12/18 over BR YAHARA RIVER

1.1M E JCT USH 51 · County 025, Wisconsin · Built 1962 · 8 Lanes · 86,700 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
B13019300000000
Year Built
1962
Reconstructed
1998
Length
6.9 m (22.6 ft)
Max Span
3 m
Lanes
8
Daily Traffic
86,700
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.