CTH PQ / WATER ST over KOSHKONONG CREEK
0.1M W JCT USH 12 · County 025, Wisconsin · Built 1957 · 2 Lanes · 1,480 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.002889, -89.019806
This bridge is in worse condition than 93.1% of bridges in County 025. The average bridge in Wisconsin is 0 years old; this one is 69 years old.
Nearby Bridges
USH 12-MAIN ST over KOSHKONONG CREEK
Built 1998
USH 18 over KOSHKONONG CREEK
Built 2000
LRD BRITZKE RD over KOSHKONONG CREEK
Built 1997
CTH B / ADAMS ST over KOSHKONONG CREEK
Built 2009
USH 12-USH 18 over MUD CREEK
Built 1988
STH 73 over MUD CREEK
Built 2015
LRD LONDON RD over MUD CREEK
Built 1996
USH 12/18 EB & WB over STH 73
Built 2015
LRD HOOPEN RD over KOSHKONONG CREEK
Built 1985
CTH O over KOSHKONONG CR
Built 2006
Bridge Details
- Structure #
- B13007200000000
- Year Built
- 1957
- Length
- 16.2 m (53.1 ft)
- Max Span
- 15.7 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 2
- Daily Traffic
- 1,480
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $220,000
- Total Project Cost
- $330,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.