CTH A over PLEASANT VALLEY BRANCH

0.1M E JCT CTH H · County 025, Wisconsin · Built 1954 · 2 Lanes · 580 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B13004400000000
Year Built
1954
Length
13 m (42.7 ft)
Max Span
12.2 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
580
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.