STH 131 over SHAW HOLLOW CREEK

2.3M N JCT CTH E · County 023, Wisconsin · Built 1940 · 2 Lanes · 210 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B12069800000000
Year Built
1940
Reconstructed
1979
Length
10.4 m (34.1 ft)
Max Span
10.3 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
210
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.