STH 171 over JOY HOLLOW CREEK

AT JOY HOLLOW CREEK · County 023, Wisconsin · Built 2014 · 2 Lanes · 340 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B12018000000000
Year Built
2014
Length
13.9 m (45.6 ft)
Max Span
13.1 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
340
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.