CTH H over PIGEON RUN CREEK

1.2M N JCT STH 171 · County 023, Wisconsin · Built 1994 · 2 Lanes · 219 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B12011700000000
Year Built
1994
Length
11 m (36.1 ft)
Max Span
10.4 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
219
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.