STH 35-STH 82-MAIN over DUCK CREEK

2.0M N JCT STH 82 TO W · County 023, Wisconsin · Built 1959 · 2 Lanes · 4,325 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B12002000000000
Year Built
1959
Length
23.2 m (76.1 ft)
Max Span
11.6 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
4,325
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.