CTH G over DUCK CREEK

2.2M W JCT STH 22 · County 021, Wisconsin · Built 1992 · 2 Lanes · 311 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B11010500000000
Year Built
1992
Length
19.4 m (63.6 ft)
Max Span
9.4 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
311
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.