STH 60 over WISCONSIN RIVER 09

0.1M E JCT STH 78 TO N · County 021, Wisconsin · Built 1971 · 2 Lanes · 6,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B11001900000000
Year Built
1971
Reconstructed
2014
Length
230.2 m (755.2 ft)
Max Span
50 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
6,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.