LRD MIDDLE RD over WEDGES CREEK

3.8M N JCT STH 95 · County 019, Wisconsin · Built 1987 · 2 Lanes · 57 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B10007800000000
Year Built
1987
Length
19.5 m (64 ft)
Max Span
9.4 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
57
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.