LRD 50TH AVE over STH 29

TOWN OF HALLIE · County 017, Wisconsin · Built 2002 · 2 Lanes · 1,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B09022200000000
Year Built
2002
Length
82.9 m (272 ft)
Max Span
43.4 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
1,500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.