LRD 120TH ST (EMER over STH 29
AT STH 29 · County 017, Wisconsin · Built 2004 · 2 Lanes · 440 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
44.894528, -91.427881
This bridge is in worse condition than 17.5% of bridges in County 017. The average bridge in Wisconsin is 0 years old; this one is 22 years old.
Nearby Bridges
STH 29 EB over UP RAILROAD
Built 2004
STH 29WB over UP RAILROAD
Built 2004
USH 53SB over UP RR & BIKE PATH
Built 2004
USH 53NB over UP RR & BIKE PATH
Built 2004
STH 29 - OFF RAMP over STH 124
Built 2004
STH 29 EB over STH 124
Built 2004
LRD 40TH AVE over USH 53
Built 1969
USH 53 S over STH 124
Built 2002
STH 29 WB over STH 124
Built 2004
USH 53 N over STH 124
Built 2002
Bridge Details
- Structure #
- B09021200000000
- Year Built
- 2004
- Length
- 98.7 m (323.8 ft)
- Max Span
- 32.8 m
- Width
- 10.3 m (33.8 ft)
- Lanes
- 2
- Daily Traffic
- 440
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.